If you are planning to get a new MEPCO electricity connection, this guide will help you complete the process smoothly. You can either apply online through the official portal or visit the nearest MEPCO office to get a printed application form. These forms list different types of electricity connections, allowing you to choose the one suitable for your requirements. After filling in the form and uploading the required documents, you can submit your application for a new connection.
Step-by-Step Procedure for MEPCO New Connections
Follow these steps to apply for a new meter connection:
- Fill the Online Application Form – Enter your details in the official portal carefully.
- Upload Required Documents – Include scanned copies of:
- Proof of property ownership
- Applicant’s undertaking
- Power of attorney (if more than one owner)
- No Objection Certificate (if the applicant is a tenant)
- Attested CNIC copies of the applicant
- Copy of the applicable tariff duly signed by the consumer
- Submit the Application – After uploading documents, submit the online form.
- Print Application Form – Keep a printed copy for your records.
- Attach Documents & Submit Offline (if required) – Send all attachments to the relevant MEPCO office.
- Receive Demand Notice – After verification, MEPCO will issue a demand notice with the required fee.
- Pay the Demand Notice – Make the payment at the designated bank and submit a copy to the office.
- Meter Installation – Once payment verification is complete, your electricity meter will be installed.
- Check Application Status – Track your application online, visit the local office, or call the MEPCO helpline using your CNIC or reference number from the demand notice.
MEPCO New Connection Demand Notice Fee
The demand notice fee varies depending on the location and type of connection:
- Rural Areas: Domestic meters usually cost between PKR 10,000 to 12,000.
- Urban Areas: Charges for developed societies are approximately PKR 10,000 to 12,000.
⚠️ These are estimated fees. Final charges depend on the MEPCO tariff structure and exact location. For detailed information, visit your nearest MEPCO office.
Estimated Time for New Connections
The timeline for getting a MEPCO connection depends on the category of your electricity supply. MEPCO divides connections into three main categories:
Category 1: Up to 15KW
- Day 1: Fill the online form and attach all required documents.
- Day 1: Submit printed documents to the MEPCO subdivision office.
- Days 2–5: Application verification and site survey scheduling.
- Days 6–9: Processing and generation of the new connection demand notice.
- Day 10: Receive SMS notification that your demand notice is ready; print and pay at the bank.
- Days 11–40: Attach paid demand notice with wiring test report.
- Day 41–45: Issuance of connection order.
- Day 46–55: MEPCO storekeeper prepares the meter.
- Day 56: Meter installation at your premises.
Category 2: 16KW to 70KW / 400 Volts
The process is similar to Category 1, but additional verification and approvals extend the timeline to approximately 68 days.
Category 3: 71KW to 500KW / 400 Volts
For higher load connections, extra approvals and verification are required. The entire process can take up to 100 days from application submission.
Final Words
Applying for a new MEPCO electricity connection or requesting changes to an existing connection (such as updating the name, load, or tariff) has become more convenient with the online ENC portal. Whether you are a residential, commercial, or industrial consumer, it is essential to:
- Understand your connection category
- Be aware of estimated timelines
- Prepare and submit all required documents accurately
Following the steps carefully will help you avoid delays and ensure a smooth connection process. For more information, visit your local MEPCO office or contact MEPCO support.